Low-Voltage Systems

From Video Surveillance to Access Control

HongYang Tech provides CCTV, access control, intrusion alarms and communications cabling. For new sites, replacements or phased expansions, planning starts with site conditions, operating needs and budget.

Services and Planning Considerations

CCTV Surveillance Systems

Manage video at stores, offices, warehouses and public areas. Plan camera locations, viewing angles and recording based on identification needs and lighting so staff can quickly retrieve footage.

Planning Considerations IP cameras, network video recorders (NVRs), retention period, storage capacity and viewing permissions.

A security camera outside a warehouse and a demonstration of restricted-area intrusion on screen.
Demonstration of CCTV restricted-area intrusion detection

Access Control

Manage access to staff entrances, offices and server rooms. Set access by role and time to simplify staff changes, permissions and access-log review.

Planning Considerations Door count, credential readers, compatibility between locks and doors, access logs and evacuation routes.

A person presents a card to a reader near a red-and-white vehicle barrier.
Card access and a vehicle barrier in use

Intrusion Alarms

Protect stores after closing, offices outside business hours and warehouse areas. Set zones based on openings, activity areas and work hours, and identify who receives and responds to alerts.

Planning Considerations Door and window contacts, indoor sensors, alarm zones, notifications and routine testing.

A door contact and wall-mounted alarm keypad in a commercial storage room.
Door sensors and intrusion alarm equipment in use

Communications and Low-Voltage Cabling

Plan cabling for new offices, store fit-outs and cable cleanup. Inventory voice, data and security endpoints, then plan cable routes, racks and port labels for future troubleshooting and expansion.

Planning Considerations Communications endpoints, structured cabling, conduits, patch panels, port labels and testing.

A technician checks switches, patch panels and network cables in a rack.
Network equipment and rack cabling

Construction Time-Lapse

Set camera locations and shooting intervals based on the project schedule and milestones. We record construction progress and edit it into time-lapse videos for updates, completion records or presentations.

A fixed time-lapse camera faces an active construction site.
Construction time-lapse camera installation

From Site Survey to Handover

  1. Requirements and Site Survey

    Review site use, existing equipment, access procedures and installation constraints. For occupied sites, discuss working hours and phased cutover.

  2. Planning and Estimates

    Define the scope by device locations, equipment, cabling and acceptance criteria. Assess whether existing equipment can be reused to compare options and set a budget.

  3. Installation, Testing and Handover

    After installation, test video retrieval, access, alarms and cable connectivity as agreed. Confirm administrative permissions, operating procedures and maintenance arrangements.

Planning a New Installation, Renovation or Replacement?

Share the project location, site use, systems required and target completion date. Plans, equipment lists or approximate device locations can help define the survey and estimate.

View Project Inquiry Information